- System components
- Basic software screens in user interface
- Data interpretation
- ½ day in length
- System components and how the system operates
- Startup and shutdown
- Measurement setup
- All software in user interface
- Verification and calibration
- Troubleshooting
- Reporting software
- Sanitation
- 2-3days in length
|
|
 |
|
 Dipix Applications Training Overview
Applications is responsible for providing both configuration training and operator
training to Dipix customers. This training typically occurs at the bakery, at the
time of new system commissioning. Although, Dipix Applications has also successfully
delivered 2 or 3 day sessions (at Dipix or the bakery) for existing customers that
have new employees, new products to measure, or would like a formal review of the
advancing Dipix software.
Operator Training provides basic theory of daily operation and techniques for
first level users. General operation of the user interface, including the
starting and stopping of production runs, viewing and understanding the
different measurement screens, and performing measurement verification are
reviewed. This training course consists of approximately a 1-2 hour lecture,
followed by 1-2 hours of hands-on training. It is recommended that line operators
and supervisors take this course as well as maintenance personnel.
As a new Dipix customer, if you are unsure what duties surround a Dipix system and/or
which of your employees are best suited to work on the Dipix system, Applications
will assist with this assessment.
Dipix strongly suggests that 2 or 3 people be designated as the Dipix system owner(s)
and it is the system owners that receive configuration training. The system owner
will become capable of training others on most aspects related to the Dipix inspection
system.
| Day 1 |
| 8:00a.m. |
- Introductions
- General system operation (flowchart, 2 cameras, laser line, illuminated area,
scans, contrast threshold, radial refinement, etc.)
|
| 9:40a.m |
|
| 10:00a.m. |
- All software screens in User Interface
|
| 12 noon |
|
| 1:00p.m. |
- Definition of measurements (configuration manual)
|
| 2:00p.m. |
- Choose measurements for defect and characteristic detection
|
| 3:00p.m. |
|
| 3:20p.m. |
-
Practice at a system
- Calibration verification
- Calibration
- External Devices-i.e., scale
|
| 4:30p.m. |
|
| Day 2 |
| 8:00a.m. |
- Formulas (acceptable operands, IIF, LSL, USL, TSL, predefinitions)
- Measurements by 'lane' (displaying faults as per across-belt position)
- Blob Analysis
|
| 10:00a.m. |
|
| 10:20a.m. |
- Finalize measurements for product defects, characteristics
- Compare measurements to corporate QA guidelines
|
| 12 noon |
|
| 1:00p.m. |
- Review measurement display layout
(on what tab do the measurements appear, in what order do they appear)
- Practice altering an existing product setup
|
| 3:10p.m. |
|
| 3:30p.m. |
- Practice setting up a new product
(preparation for new product introductions from corporate)
- Practice altering SPC chart setup
|
| 4:30p.m. |
|
| Day 3 |
| 8:00a.m. |
- Troubleshooting:
- Radial Refinement
- Odd shaped guardband
- Troubleshooting flowcharts:
- Excessive Rejection
- Too Little Rejection
|
| 9:40a.m. |
|
| 10:00a.m. |
- Procedure to copy product setup changes from one system to another
(copying the l800sys.mdb and l800spc.mdb)
- Database management and file backup
- Envision/Q-Reporter Reporting Software (practice data and system reports)
|
| 12 noon |
|
| 1:00p.m. |
- Review actions of operators, including SPC interpretation
- Discuss how the systems and data reports fit in to the work day of other personnel
(everyday, only when there is a problem, remotely, etc.)
- General system duty assignments (separate document)
|
| 2:40p.m. |
|
| 3:00p.m. |
- Discuss Service Contracts
- Discuss future inspection/software requirements
- Answer and/or record all open questions
|
| 3:00p.m. |
|
 |
 |
|
|
|
|
|
 |
 |